Coles Distribution Centre
Richard Crookes Construction engaged Ryan Civil Contracting to carry out the placement of Cement Treated CBR material, internal stormwater works and the construction of internal …
Aerodrome Road Intersection Upgrade and Road Rehabilitation
MBRC engaged Ryan Civil Contracting to carry out the reconfiguration of the existing priority controlled ‘T’ intersection to traffic signals and the rehabilitation of 5000m2 of …
Samsonvale Road Upgrade Stage 2
MBRC engaged Ryan Civil Contracting to carry out the widening and reconstruction of Samsonvale Road, Kentwood/Elmwood Drive intersection upgrade, major drainage work, pathway …
Boundary Road Safety Upgrade
MBRC as part of the Federally funded ‘Black Spot Program’ engaged Ryan Civil Contracting to carry out a curve realignment on a section of Boundary Road.
Project …
Freeway Office Park Stage 2
Fowke D&C engaged Ryan Civil Contracting to carry out road slip failure rehabilitation works on a section of the heavily trafficked Logan Road.
Project Summary
Extensive …
Youngs Crossing Road Rehabilitation
MBRC engaged Ryan Civil Contracting to carry out the rehabilitation of Youngs Crossing Road, between Dayboro Road and the floodway (approx. 500m). Due to the high traffic volumes, …
Mylan Pharmaceuticals Warehouse
Tomkins engaged Ryan Civil Contracting to carry out the site clearing, bulk earthworks, stormwater drainage and construction of external pavements of the greenfield project in …
Waterford West State School Remedial Drainage Works
Cardno engaged Ryan Civil Contracting to carry out remedial drainage works for Waterford West State School. Special consideration was required for this project to ensure works were …
QLD State Netball Centre
Ryan Civil Contracting was contracted to carry out the bulk earthworks, cut / fill, and export to achieve a building platform for the new QLD Netball Centre. This contract was …
Schweppes Facility
The new Schweppes / Asarki Facility civil contract was awarded to
Ryan Civil Contracting. The works consisted of carry out the bulk
earthworks, cut / fill, and export to achieve …
Bunnings Keperra
DeLuca engaged Ryan Civil Contracting to carry out the external road widening of Settlement Road and minor re-aligning of Samford Road Keperra. The contract between DeLuca and Ryan …
De Havilland Drive
MBRC engaged Ryan Civil Contracting to carry out the Concrete lined drain at De Havilland Drive Bray Park. The works consisted of reshaping the existing earth formation, removing …
Heathwood Industrial Estate
Ryan Civil Contracting was contracted to trim the subgrade provided, cut to fill where required, all civil stormwater works, remove existing erosion and environmental controls, …
Brickworks Place
Ryan Civil Contracting was contracted to carry out the Civil storm water works and structures on Lot 4 & 5 Brickworks Place Rochedale.
Project Summary
Reinforced …
Bunnings Springfield
This Project is a 36,000m2 development for the Bunnings Group. Ryan Civil Contracting we engaged by De Luca Corporation to complete the entire Internal civil works and …
ACFS Container Facility
Ryan Civil Contracting were engaged to complete the stormwater works on this project. Due to the nature of the sandy conditions at the Port of Brisbane up to 60% of this drainage …
TNT Logistics Facility
This project consisted of an 80,000m2 commercial development. Ryan Civil Contracting were engaged to complete the entire bulk earthworks, drainage …
Bunnings West Ipswich
Main contractor ADCO Constructions engaged Ryan Civil Contracting for the external civil works package for this project. The project had numerous challenges the most predominant …
Northline Logistics Facility
Following on from the successful completion of DB Schenker, Ryan Civil Contracting were awarded the pavement preparation and carpark works for the Northline Logistics Facility in …
DB Schenker
Ryan Civil Contracting were engaged to complete the civil package for this 82,000m2 commercial facility. Due to the tight program involved, a large amount of coordination and …
Lawnton Industrial Development – Stage 2
This project consisted of the entire internal civil works package for as well as external road widening to Moreton Bay Regional Shire Council …
Residential Sub Division
Ryan Civil Contracting were awarded the contract for the complete development of this residential sub-division in Pine Mountain. The works included site clearance, bulk …
Ripley Fire Station
This project consisted of the site clearance and bulk earthworks for the site, including the removal of silty sand and import of suitable material, stormwater drainage including 1 …
St Benedict’s College Stage 1 and 2
Ryan Civil Contracting initially were awarded the contract for the civil works for Stage 1 on St Benedict’s College. Following the successful completion of Stage 1, Ryan …
Energex Kelvin Grove
This project involved the bulk excavation and haulage offsite of 11,000m3 from a basement excavation, stormwater drainage, watermains, bio-retention basins …
McKenzie State Campus
This 13,000m2 site was the location for the re-development of the new primary school at McKenzie. Ryan Civil Contracting completed the entire civil package consisting of bulk …
Ipswich Ambulance Station
Ryan Civil Contracting completed the civil works including bulk earthworks, drainage, sewer, watermain and AC pavements for the new Ipswich Ambulance Station.
LOCATION: Cnr of …
Prince Charles Hospital Chermside Stage 1 and 2
Both stages of this project consisted of circa 5,000m2 of new carpark for Chermside Hospital. Ryan Civil Contracting completed the entire package from site clearance, bulk …