Ryan Civil Contracting was contracted to trim the subgrade provided, cut to fill where required, all civil stormwater works, remove existing erosion and environmental controls, provide base course to the building site and new access road. Clean, rebuild, and make good bio basins.
Project Summary
- General site clearance
- Cut to fill and reshape
- Environmental controls
- Reinforced Concrete Box Culverts
- Storm water structures
- Bio-Retention basins
- Retaining wall backfilling
LOCATION: Seeana Place, Heathwood
CLIENT: SpaceFrame Buildings Pty Ltd
DATE: September 2016