The new Schweppes / Asarki Facility civil contract was awarded to Ryan Civil Contracting. The works consisted of carry out the bulk earthworks, cut / fill, and export to achieve a building platforms, excavation and back fill of tanks, Cement Treat CBR material for the high Bay area, Civil Stormwater, internal and external road pavements and bio basins and filtration systems.
Project Summary:
- 53,000m2 site clearance
- 10,000m3 removed and hauled offsite
- 15,000m3 cut to fill
- 20,000m2 of external hardstand base course
- 4,000m2 of Asphalt pavement including all base courses
- Supply and place 500mm deep CTB Material to engineer’s speciation
- Excavate, stockpile, condition, place and compact subgrade
- Remediation works
- External live road modifications
- 1,200m of Civil Stormwater
- Civil Stormwater structures
- Bio Basins, swales and specialist filtration units
- 1.0km of kerbing and subsoil drainage
- 13,000m2 of AC pavements including base courses
- Line marking and wheel stops
LOCATION Staplyton Road Heathwood
CLIENT: FDC Construction and Fit Out (QLD) Pty Ltd
DATE: January 2017