This project involved the bulk excavation and haulage offsite of 11,000m3 from a basement excavation, stormwater drainage, watermains, bio-retention basins as well as AC driveways and footpaths to serve the constructed building.
LOCATION: Kelvin Grove Rd, Kelvin Grove
CLIENT: Kane Constructions Pty Ltd
DATE: August 2012