Tomkins engaged Ryan Civil Contracting to carry out the site clearing, bulk earthworks, stormwater drainage and construction of external pavements of the greenfield project in Bundamba.
Project Summary
- Establishment of erosion and sediment control devices including excavation of a temporary sediment basin
- 29,000m2 site clearance
- 3000m3 cut to fill
- 3000m3 cut to offsite
- 11,000m2 of external hardstand subbase
- 2,000m2 of asphalt pavement including all base courses
- 42m3 of detailed excavation for stormwater tanks
- Installation of Spel filter and vault
- 471m of civil stormwater drainage and associated structures
- 400m of kerbing and subsoil drainage
- Line marking and wheel stops
LOCATION: Hoepner Road, Bundamba
CLIENT: Tomkins Commercial & Industrial Builders
DATE: June 2019
![](https://www.ryancivilcontracting.com.au/wp-content/uploads/2020/05/2019-06-21-12.06.40.jpg)
![](https://www.ryancivilcontracting.com.au/wp-content/uploads/2020/05/2019-06-21-12.06.45.jpg)
![](https://www.ryancivilcontracting.com.au/wp-content/uploads/2020/05/2019-06-21-14.46.17.jpg)
![](https://www.ryancivilcontracting.com.au/wp-content/uploads/2020/05/2019-06-21-14.56.49.jpg)
![](https://www.ryancivilcontracting.com.au/wp-content/uploads/2020/05/2019-06-24-16.48.44.jpg)
![](https://www.ryancivilcontracting.com.au/wp-content/uploads/2020/05/2019-06-24-16.56.25.jpg)
![](https://www.ryancivilcontracting.com.au/wp-content/uploads/2020/05/2019-06-27-12.00.21.jpg)
![](https://www.ryancivilcontracting.com.au/wp-content/uploads/2020/05/2019-06-27-12.37.19.jpg)