This project consisted of the site clearance and bulk earthworks for the site, including the removal of silty sand and import of suitable material, stormwater drainage including 1 x Humeceptor, subbase preparation for concrete pavements and a 2,000m2 road widening to main roads specification including traffic control.
LOCATION: Ripley Road, Ipswich
CLIENT: ICD Group
DATE: September 2012