Ryan Civil Contracting were engaged to complete the stormwater works on this project. Due to the nature of the sandy conditions at the Port of Brisbane up to 60% of this drainage was completed under the water level. Ryan Civil Contracting employed the use of Well point dewatering and spearing as a means to dewatering in order to safely and productively install the stormwater drainage. 

Project Summary

  • 1.6km of stormwater drainage 
  • Pipe sizes from 1200 to 225  
  • Pipe depths up to 3.5m deep 
  • 35 stormwater pits  
  • 1km of wellpoint dewatering and spearing utilised to dewater works 
  • Sheet piling and trench boxes utilised for shoring requirements 
  • Bio retention basins 

LOCATION: Bishop Drive, Port of Brisbane
CLIENT: Hansen Yuncken Pty Ltd
DATE: January 2015